N E S W 263°
26R / 08L
RWY 26R/08L
HDG 263°
LEN 8,707 ft
Aalborg Airport

Runway 26R at EKYT

Runway 26R/08L at Aalborg Airport (EKYT) in Aalborg is a 8,707 ft, lighted, asphalt/concrete runway oriented 263°/083°. The runway is 148 ft wide. SkyMeter has observed 587 landings and 464 departures on this runway over the last 30 days, with approximately 0.2% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 2.6°, touchdowns averaging 436 ft past the threshold, a typical touchdown ground speed of 120 kt, a 4.7 kt average crosswind component, a 12.9 kt average headwind.

Last 30 Days
1051 Operations
464 Deps / 587 Arrs

Runway 26R/08L at Aalborg Airport (EKYT) in Aalborg is a 8,707 ft, lighted, asphalt/concrete runway oriented 263°/083°. The runway is 148 ft wide. SkyMeter has observed 587 landings and 464 departures on this runway over the last 30 days, with approximately 0.2% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 2.6°, touchdowns averaging 436 ft past the threshold, a typical touchdown ground speed of 120 kt, a 4.7 kt average crosswind component, a 12.9 kt average headwind.

Runway at a Glance

Arrival Volume

587 landings observed on Runway 26R in the last 30 days, alongside 464 departures.

Low Go-Around Rate

0.2% of arrivals at Runway 26R result in a go-around (1 in the last 30 days).

Peak Hour

Busiest landing window observed at 14:00 with 6 arrivals on the recent sample.

Average Touchdown Zone

Aircraft touch down on average 436 ft from the threshold on Runway 26R.

Prevailing Wind & Gust History

Over the past 365 days, winds at EKYT have prevailed from the west-southwest (240°), accounting for roughly 18% of windy observations. Average wind speed sits at 8.7 kt with peak gusts to 41 kt. Strong-wind days are infrequent here.

Light Crosswind Component

Average crosswind on landing is 4.7 kt at touchdown, measured against runway 26R alignment.

Approach Slope

Final-approach slope averages 2.6° on Runway 26R, shallower than the standard 3°.

Landing Behavior and Touchdown Performance

The metrics below are computed from ADS-B trace data observed at Runway 26R over the last 30 days. Each value is shown only when at least 10 valid samples were available; sparse cells are hidden rather than estimated.

Avg approach slope
2.6°
Avg touchdown GS
120 kts
Avg touchdown zone
436 ft
Avg headwind
12.9 kt

Hourly Landing Distribution

05:00 1 landings
06:00 1 landings
07:00 2 landings
08:00 1 landings
09:00 2 landings
10:00 3 landings
11:00 4 landings
12:00 4 landings
13:00 5 landings
14:00 6 landings
15:00 2 landings
16:00 4 landings
17:00 5 landings
18:00 3 landings
19:00 1 landings
20:00 2 landings
21:00 1 landings
22:00 1 landings
23:00 2 landings

Recent observed landings on Runway 26R grouped by hour-of-day (UTC).

Go-Around Analysis

A go-around occurs when a pilot aborts a landing attempt and initiates a climb to return for another approach. While go-arounds are a normal safety procedure, their frequency and causes provide insight into operational challenges at specific runways. Runway 26R experienced go-arounds in 0.2% of arrivals over the last 30 days (1 events of 588 attempts).

Recent Go-Around Events

8998c7fa-0fbd-4d47-b818-73e93c80ff98
2026-06-30 10:05
Other
8998c7fa-0fbd-4d47-b818-73e93c80ff98
2026-06-30 10:05
Other
8998c7fa-0fbd-4d47-b818-73e93c80ff98
2026-06-30 10:05
Other

These events represent normal safety procedures and do not indicate operational deficiencies.

Go-Around Causes Distribution

Other 3 events (100%)

Environmental factors dominate go-around causes, indicating that operational procedures remain sound.

Approach Types and Categories

Aircraft approach runways using different procedures based on weather conditions, visibility, and available navigation equipment. An Instrument Landing System (ILS) approach provides precision horizontal and vertical guidance using ground-based radio signals, enabling aircraft to land in low visibility conditions. Visual approaches require pilots to maintain visual contact with the runway and surrounding terrain, typically used during clear weather. Area Navigation (RNAV) approaches use GPS technology to guide aircraft along specific flight paths.

Approach Categories Explained

Category (CAT) classifications define minimum visibility and decision height requirements for instrument approaches. Higher categories enable operations in lower visibility conditions.

CAT I
Decision Height: 200 ft
Visibility: 550m
CAT II
Decision Height: 100 ft
Visibility: 300m
CAT III
Decision Height: 0-50 ft
Visibility: 0-200m
Visual
Clear of Clouds
Visibility: 5 km

Wind and Environmental Factors

Wind conditions directly impact runway operations, influencing approach difficulty, landing performance, and runway selection. Runway 26R benefits from favorable wind alignment, with prevailing winds creating minimal crosswind components for most operations. Average wind speeds of 12 knots pose no operational constraints for commercial aircraft.

24-Hour Wind Pattern

12:00
268° at 14 kts, gusting 33 kts
14 kts
13:00
244° at 16 kts, gusting 34 kts
16 kts
14:00
272° at 12 kts, gusting 0 kts
12 kts
16:00
252° at 15 kts, gusting 27 kts
15 kts
17:00
270° at 14 kts, gusting 31 kts
14 kts
18:00
257° at 19 kts, gusting 32 kts
19 kts
23:00
255° at 12 kts, gusting 0 kts
12 kts
05:00
250° at 12 kts, gusting 0 kts
12 kts
07:00
265° at 14 kts, gusting 0 kts
14 kts
08:00
260° at 12 kts, gusting 0 kts
12 kts
09:00
270° at 14 kts, gusting 30 kts
14 kts
10:00
277° at 16 kts, gusting 30 kts
16 kts
11:00
258° at 14 kts, gusting 33 kts
14 kts
15:00
260° at 13 kts, gusting 0 kts
13 kts
19:00
290° at 6 kts, gusting 0 kts
6 kts
21:00
290° at 6 kts, gusting 0 kts
6 kts
06:00
280° at 14 kts, gusting 0 kts
14 kts
20:00
280° at 17 kts, gusting 29 kts
17 kts
22:00
270° at 14 kts, gusting 0 kts
14 kts
METAR
240° at 13 kts, gusting 0 kts
13 kts

Wind patterns show typical diurnal variation with stronger winds during midday hours.

Average Speed
12 kts
Peak Gust
18 kts
Prevailing Direction
263°
Avg Crosswind
8 kts

Related Pages

About This Data

This analysis covers 1051 operations recorded over the past 30 days, derived from global ADS-B flight broadcasts. Coverage may be incomplete in areas with limited ground-station reception, and statistics may vary with weather and traffic volume.