Airliner on final approach at sunset. Every flight, replayed and analyzed on SkyMeter
Powered by Global ADS-B Feeds

Replay Any Flight.
Understand Every Moment.

NTSB-style flight replays with ADS-B data processing, historical weather context, 3D terrain visualization, and precision interpolation. Built for pilots, safety analysts, and aviation enthusiasts.

Everything You Need to Understand a Flight

Search, replay, and analyze millions of flights with the tools professionals use to see what really happened.

AI natural-language flight search across a globe of flight paths 1

Find Any Flight

Use natural language to search millions of flights across years of history. Filter by aircraft, callsign, route, altitude, or even wind.

Color-coded 3D approach path with synced altitude and speed labels descending to a runway 2

Rebuild the Timeline

Replay the flight second-by-second with smooth motion. Attitude, speed, heading, and position synced together.

SkyMeter replay cockpit with full instrument panel, 3D view, and map 3

Understand the Moment

Scrub, pause, inspect any moment. View in 3D terrain context to see what happened and why.

Detected-incident panel highlighting an unstable approach 4

Incident Detection

Find detected aviation incidents, go-arounds, unstable and missed approaches, and more.

Runway touchdown heatmap with landing and touchdown-distance stats 5

Runway Metrics

See how every runway really performs: landings, touchdown points, long-landing rates, approach speeds, and go-arounds, aggregated from thousands of real operations.

Flight exported to X-Plane with FDR, CSV, and KML formats 6

X-Plane Exports

View your flight in the X-Plane simulator for cinema-quality graphics.