N E S W 198°
19 / 01
RWY 19/01
HDG 198°
LEN 7,265 ft
Malmen Air Base

Runway 19 at ESCF

Runway 19/01 at Malmen Air Base (ESCF) in Linköping is a 7,265 ft, lighted, asphalt runway oriented 198°/018°. The runway is 115 ft wide. SkyMeter has observed 15 landings and 25 departures on this runway over the last 30 days, with approximately 6.2% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 3.0°, touchdowns averaging 494 ft past the threshold, a typical touchdown ground speed of 125 kt, a 5.7 kt average crosswind component, a 3.3 kt average headwind.

Last 30 Days
40 Operations
25 Deps / 15 Arrs

Runway 19/01 at Malmen Air Base (ESCF) in Linköping is a 7,265 ft, lighted, asphalt runway oriented 198°/018°. The runway is 115 ft wide. SkyMeter has observed 15 landings and 25 departures on this runway over the last 30 days, with approximately 6.2% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 3.0°, touchdowns averaging 494 ft past the threshold, a typical touchdown ground speed of 125 kt, a 5.7 kt average crosswind component, a 3.3 kt average headwind.

Runway at a Glance

Arrival Volume

15 landings observed on Runway 19 in the last 30 days, alongside 25 departures.

Elevated Go-Around Rate

6.2% of arrivals at Runway 19 result in a go-around (1 in the last 30 days).

Peak Hour

Busiest landing window observed at 13:00 with 13 arrivals on the recent sample.

Average Touchdown Zone

Aircraft touch down on average 494 ft from the threshold on Runway 19.

Prevailing Wind & Gust History

Over the past 365 days, winds at ESCF have prevailed from the south-southwest (210°), accounting for roughly 16% of windy observations. Average wind speed sits at 6.8 kt with peak gusts to 38 kt. Strong-wind days are infrequent here.

Moderate Crosswind Component

Average crosswind on landing is 5.7 kt at touchdown, measured against runway 19 alignment.

Approach Slope

Final-approach slope averages 3.0° on Runway 19, consistent with the standard 3° glide path.

Landing Behavior and Touchdown Performance

The metrics below are computed from ADS-B trace data observed at Runway 19 over the last 30 days. Each value is shown only when at least 10 valid samples were available; sparse cells are hidden rather than estimated.

Avg approach slope
3.0°
Avg touchdown GS
125 kts
Avg touchdown zone
494 ft
Avg headwind
3.3 kt

Hourly Landing Distribution

04:00 3 landings
09:00 10 landings
12:00 4 landings
13:00 13 landings
15:00 8 landings
16:00 4 landings
18:00 4 landings
19:00 4 landings

Recent observed landings on Runway 19 grouped by hour-of-day (UTC).

Go-Around Analysis

A go-around occurs when a pilot aborts a landing attempt and initiates a climb to return for another approach. While go-arounds are a normal safety procedure, their frequency and causes provide insight into operational challenges at specific runways. Runway 19 experienced go-arounds in 6.2% of arrivals over the last 30 days (1 events of 16 attempts).

Recent Go-Around Events

a444f715-09ef-a74c-88fa-22cc6029fd56
2026-06-23 09:29
Other
a444f715-09ef-a74c-88fa-22cc6029fd56
2026-06-23 09:29
Other
a444f715-09ef-a74c-88fa-22cc6029fd56
2026-06-23 09:29
Other
a444f715-09ef-a74c-88fa-22cc6029fd56
2026-06-23 09:29
Other
a444f715-09ef-a74c-88fa-22cc6029fd56
2026-06-23 09:29
Other

These events represent normal safety procedures and do not indicate operational deficiencies.

Go-Around Causes Distribution

Other 5 events (100%)

Environmental factors dominate go-around causes, indicating that operational procedures remain sound.

Approach Types and Categories

Aircraft approach runways using different procedures based on weather conditions, visibility, and available navigation equipment. An Instrument Landing System (ILS) approach provides precision horizontal and vertical guidance using ground-based radio signals, enabling aircraft to land in low visibility conditions. Visual approaches require pilots to maintain visual contact with the runway and surrounding terrain, typically used during clear weather. Area Navigation (RNAV) approaches use GPS technology to guide aircraft along specific flight paths.

Approach Categories Explained

Category (CAT) classifications define minimum visibility and decision height requirements for instrument approaches. Higher categories enable operations in lower visibility conditions.

CAT I
Decision Height: 200 ft
Visibility: 550m
CAT II
Decision Height: 100 ft
Visibility: 300m
CAT III
Decision Height: 0-50 ft
Visibility: 0-200m
Visual
Clear of Clouds
Visibility: 5 km

Wind and Environmental Factors

Wind conditions directly impact runway operations, influencing approach difficulty, landing performance, and runway selection. Runway 19 benefits from favorable wind alignment, with prevailing winds creating minimal crosswind components for most operations. Average wind speeds of 12 knots pose no operational constraints for commercial aircraft.

24-Hour Wind Pattern

09:00
280° at 9 kts, gusting 11 kts
9 kts
13:00
238° at 7 kts, gusting 0 kts
7 kts
15:00
260° at 12 kts, gusting 0 kts
12 kts
16:00
280° at 8 kts, gusting 0 kts
8 kts
18:00
295° at 3 kts, gusting 5 kts
3 kts
19:00
160° at 7 kts, gusting 0 kts
7 kts
12:00
198° at 4 kts, gusting 4 kts
4 kts
04:00
240° at 4 kts, gusting 0 kts
4 kts
METAR
190° at 3 kts, gusting 0 kts
3 kts

Wind patterns show typical diurnal variation with stronger winds during midday hours.

Average Speed
12 kts
Peak Gust
18 kts
Prevailing Direction
198°
Avg Crosswind
8 kts

Related Pages

About This Data

This analysis covers 40 operations recorded over the past 30 days, derived from global ADS-B flight broadcasts. Coverage may be incomplete in areas with limited ground-station reception, and statistics may vary with weather and traffic volume.