N E S W 131°
15 / 33
RWY 15/33
HDG 131°
LEN 8,320 ft
Burlington International Airport

Runway 15 at KBTV

Runway 15/33 at Burlington International Airport (KBTV) in Burlington is a 8,320 ft, lighted, asphalt runway oriented 131°/311°. The runway is 150 ft wide. SkyMeter has observed 1,109 landings and 33 departures on this runway over the last 30 days, with approximately 0.1% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 3.2°, touchdowns averaging 1,226 ft past the threshold, a typical touchdown ground speed of 113 kt, a 6.9 kt average crosswind component, a 3.2 kt average headwind.

Last 30 Days
1142 Operations
33 Deps / 1109 Arrs

Runway 15/33 at Burlington International Airport (KBTV) in Burlington is a 8,320 ft, lighted, asphalt runway oriented 131°/311°. The runway is 150 ft wide. SkyMeter has observed 1,109 landings and 33 departures on this runway over the last 30 days, with approximately 0.1% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 3.2°, touchdowns averaging 1,226 ft past the threshold, a typical touchdown ground speed of 113 kt, a 6.9 kt average crosswind component, a 3.2 kt average headwind.

Runway at a Glance

Arrival Volume

1,109 landings observed on Runway 15 in the last 30 days, alongside 33 departures.

Peak Hour

Busiest landing window observed at 15:00 with 6 arrivals on the recent sample.

Average Touchdown Zone

Aircraft touch down on average 1,226 ft from the threshold on Runway 15.

Prevailing Wind & Gust History

Over the past 365 days, winds at KBTV have prevailed from the south (180°), accounting for roughly 27% of windy observations. Average wind speed sits at 5.3 kt with peak gusts to 41 kt. Strong-wind days are infrequent here.

Moderate Crosswind Component

Average crosswind on landing is 6.9 kt at touchdown, measured against runway 15 alignment.

Approach Slope

Final-approach slope averages 3.2° on Runway 15, consistent with the standard 3° glide path.

Landing Behavior and Touchdown Performance

The metrics below are computed from ADS-B trace data observed at Runway 15 over the last 30 days. Each value is shown only when at least 10 valid samples were available; sparse cells are hidden rather than estimated.

Avg approach slope
3.2°
Avg touchdown GS
113 kts
Avg touchdown zone
1,226 ft
Avg headwind
3.2 kt

Hourly Landing Distribution

00:00 2 landings
01:00 2 landings
02:00 2 landings
03:00 2 landings
04:00 1 landings
11:00 3 landings
12:00 5 landings
13:00 2 landings
14:00 3 landings
15:00 6 landings
16:00 3 landings
17:00 4 landings
18:00 2 landings
19:00 3 landings
20:00 3 landings
21:00 3 landings
22:00 2 landings
23:00 2 landings

Recent observed landings on Runway 15 grouped by hour-of-day (UTC).

Go-Around Analysis

A go-around occurs when a pilot aborts a landing attempt and initiates a climb to return for another approach. While go-arounds are a normal safety procedure, their frequency and causes provide insight into operational challenges at specific runways. Runway 15 experienced go-arounds in 0.1% of arrivals over the last 30 days (1 events of 1110 attempts).

Recent Go-Around Events

21aa5ac9-1ae5-704f-b15f-51dfa3f15eb7
2026-09-04 03:28
Unstable Approach
9fa22b95-3128-0247-94eb-dc50cc9542c8
2026-08-31 15:07
Other

These events represent normal safety procedures and do not indicate operational deficiencies.

Go-Around Causes Distribution

Unstable Approach 1 events (50%)
Other 1 events (50%)

Environmental factors dominate go-around causes, indicating that operational procedures remain sound.

Approach Types and Categories

Aircraft approach runways using different procedures based on weather conditions, visibility, and available navigation equipment. An Instrument Landing System (ILS) approach provides precision horizontal and vertical guidance using ground-based radio signals, enabling aircraft to land in low visibility conditions. Visual approaches require pilots to maintain visual contact with the runway and surrounding terrain, typically used during clear weather. Area Navigation (RNAV) approaches use GPS technology to guide aircraft along specific flight paths.

Approach Categories Explained

Category (CAT) classifications define minimum visibility and decision height requirements for instrument approaches. Higher categories enable operations in lower visibility conditions.

CAT I
Decision Height: 200 ft
Visibility: 550m
CAT II
Decision Height: 100 ft
Visibility: 300m
CAT III
Decision Height: 0-50 ft
Visibility: 0-200m
Visual
Clear of Clouds
Visibility: 5 km

Wind and Environmental Factors

Wind conditions directly impact runway operations, influencing approach difficulty, landing performance, and runway selection. Runway 15 benefits from favorable wind alignment, with prevailing winds creating minimal crosswind components for most operations. Average wind speeds of 12 knots pose no operational constraints for commercial aircraft.

24-Hour Wind Pattern

22:00
180° at 10 kts, gusting 18 kts
10 kts
23:00
180° at 11 kts, gusting 17 kts
11 kts
00:00
185° at 8 kts, gusting 15 kts
8 kts
01:00
176° at 12 kts, gusting 23 kts
12 kts
02:00
168° at 7 kts, gusting 23 kts
7 kts
03:00
177° at 6 kts, gusting 3 kts
6 kts
04:00
180° at 8 kts, gusting 0 kts
8 kts
11:00
187° at 6 kts, gusting 17 kts
6 kts
12:00
188° at 7 kts, gusting 3 kts
7 kts
13:00
230° at 8 kts, gusting 0 kts
8 kts
14:00
192° at 9 kts, gusting 12 kts
9 kts
15:00
239° at 10 kts, gusting 12 kts
10 kts
16:00
196° at 9 kts, gusting 12 kts
9 kts
17:00
195° at 10 kts, gusting 20 kts
10 kts
18:00
195° at 8 kts, gusting 0 kts
8 kts
19:00
190° at 8 kts, gusting 0 kts
8 kts
20:00
230° at 6 kts, gusting 0 kts
6 kts
21:00
243° at 6 kts, gusting 0 kts
6 kts
METAR
0° at 0 kts, gusting 0 kts
0 kts

Wind patterns show typical diurnal variation with stronger winds during midday hours.

Average Speed
12 kts
Peak Gust
18 kts
Prevailing Direction
131°
Avg Crosswind
8 kts

Related Pages

About This Data

This analysis covers 1142 operations recorded over the past 30 days, derived from global ADS-B flight broadcasts. Coverage may be incomplete in areas with limited ground-station reception, and statistics may vary with weather and traffic volume.