N E S W 137°
13 / 31
RWY 13/31
HDG 137°
LEN 10,000 ft
Brindisi – Salento Airport

Runway 13 at LIBR

Runway 13/31 at Brindisi – Salento Airport (LIBR) in Brindisi is a 10,000 ft, lighted, asphalt runway oriented 137°/317°. The runway is 148 ft wide. SkyMeter has observed 388 landings and 85 departures on this runway over the last 30 days, with approximately 0.3% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 2.1°, touchdowns averaging 721 ft past the threshold, a typical touchdown ground speed of 140 kt, a 2.9 kt average crosswind component, a 5.3 kt average headwind.

Last 30 Days
473 Operations
85 Deps / 388 Arrs

Runway 13/31 at Brindisi – Salento Airport (LIBR) in Brindisi is a 10,000 ft, lighted, asphalt runway oriented 137°/317°. The runway is 148 ft wide. SkyMeter has observed 388 landings and 85 departures on this runway over the last 30 days, with approximately 0.3% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 2.1°, touchdowns averaging 721 ft past the threshold, a typical touchdown ground speed of 140 kt, a 2.9 kt average crosswind component, a 5.3 kt average headwind.

Runway at a Glance

Arrival Volume

388 landings observed on Runway 13 in the last 30 days, alongside 85 departures.

Low Go-Around Rate

0.3% of arrivals at Runway 13 result in a go-around (1 in the last 30 days).

Peak Hour

Busiest landing window observed at 11:00 with 5 arrivals on the recent sample.

Average Touchdown Zone

Aircraft touch down on average 721 ft from the threshold on Runway 13.

Prevailing Wind & Gust History

Over the past 365 days, winds at LIBR have prevailed from the north-northwest (330°), accounting for roughly 23% of windy observations. Average wind speed sits at 8.6 kt with peak gusts to 39 kt. Strong-wind days are infrequent here.

Light Crosswind Component

Average crosswind on landing is 2.9 kt at touchdown, measured against runway 13 alignment.

Approach Slope

Final-approach slope averages 2.1° on Runway 13, shallower than the standard 3°.

Landing Behavior and Touchdown Performance

The metrics below are computed from ADS-B trace data observed at Runway 13 over the last 30 days. Each value is shown only when at least 10 valid samples were available; sparse cells are hidden rather than estimated.

Avg approach slope
2.1°
Avg touchdown GS
140 kts
Avg touchdown zone
721 ft
Avg headwind
5.3 kt

Hourly Landing Distribution

04:00 1 landings
05:00 2 landings
08:00 1 landings
09:00 3 landings
10:00 4 landings
11:00 5 landings
12:00 3 landings
13:00 4 landings
14:00 3 landings
15:00 1 landings
16:00 5 landings
17:00 4 landings
18:00 3 landings
19:00 2 landings
20:00 4 landings
21:00 2 landings
22:00 3 landings

Recent observed landings on Runway 13 grouped by hour-of-day (UTC).

Go-Around Analysis

A go-around occurs when a pilot aborts a landing attempt and initiates a climb to return for another approach. While go-arounds are a normal safety procedure, their frequency and causes provide insight into operational challenges at specific runways. Runway 13 experienced go-arounds in 0.3% of arrivals over the last 30 days (1 events of 389 attempts).

Recent Go-Around Events

a00f8956-c43a-f144-a63b-dccef0ab1e02
2026-07-12 07:47
Unstable Approach
a00f8956-c43a-f144-a63b-dccef0ab1e02
2026-07-12 07:47
Unstable Approach
a00f8956-c43a-f144-a63b-dccef0ab1e02
2026-07-12 07:47
Unstable Approach

These events represent normal safety procedures and do not indicate operational deficiencies.

Go-Around Causes Distribution

Unstable Approach 3 events (100%)

Environmental factors dominate go-around causes, indicating that operational procedures remain sound.

Approach Types and Categories

Aircraft approach runways using different procedures based on weather conditions, visibility, and available navigation equipment. An Instrument Landing System (ILS) approach provides precision horizontal and vertical guidance using ground-based radio signals, enabling aircraft to land in low visibility conditions. Visual approaches require pilots to maintain visual contact with the runway and surrounding terrain, typically used during clear weather. Area Navigation (RNAV) approaches use GPS technology to guide aircraft along specific flight paths.

Approach Categories Explained

Category (CAT) classifications define minimum visibility and decision height requirements for instrument approaches. Higher categories enable operations in lower visibility conditions.

CAT I
Decision Height: 200 ft
Visibility: 550m
CAT II
Decision Height: 100 ft
Visibility: 300m
CAT III
Decision Height: 0-50 ft
Visibility: 0-200m
Visual
Clear of Clouds
Visibility: 5 km

Wind and Environmental Factors

Wind conditions directly impact runway operations, influencing approach difficulty, landing performance, and runway selection. Runway 13 benefits from favorable wind alignment, with prevailing winds creating minimal crosswind components for most operations. Average wind speeds of 12 knots pose no operational constraints for commercial aircraft.

24-Hour Wind Pattern

05:00
135° at 4 kts, gusting 0 kts
4 kts
11:00
94° at 9 kts, gusting 0 kts
9 kts
17:00
208° at 6 kts, gusting 0 kts
6 kts
20:00
220° at 5 kts, gusting 0 kts
5 kts
21:00
335° at 6 kts, gusting 0 kts
6 kts
04:00
100° at 4 kts, gusting 0 kts
4 kts
08:00
100° at 9 kts, gusting 0 kts
9 kts
09:00
100° at 9 kts, gusting 0 kts
9 kts
10:00
100° at 10 kts, gusting 0 kts
10 kts
12:00
117° at 10 kts, gusting 0 kts
10 kts
13:00
138° at 10 kts, gusting 0 kts
10 kts
14:00
137° at 9 kts, gusting 0 kts
9 kts
15:00
140° at 9 kts, gusting 0 kts
9 kts
16:00
128° at 8 kts, gusting 0 kts
8 kts
18:00
180° at 5 kts, gusting 0 kts
5 kts
19:00
170° at 4 kts, gusting 0 kts
4 kts
22:00
117° at 2 kts, gusting 0 kts
2 kts
METAR
0° at 2 kts, gusting 0 kts
2 kts

Wind patterns show typical diurnal variation with stronger winds during midday hours.

Average Speed
12 kts
Peak Gust
18 kts
Prevailing Direction
137°
Avg Crosswind
8 kts

Related Pages

About This Data

This analysis covers 473 operations recorded over the past 30 days, derived from global ADS-B flight broadcasts. Coverage may be incomplete in areas with limited ground-station reception, and statistics may vary with weather and traffic volume.