N E S W 102°
11 / 29
RWY 11/29
HDG 102°
LEN 10,827 ft
Ministro Pistarini International Airport

Runway 11 at SAEZ

Runway 11/29 at Ministro Pistarini International Airport (SAEZ) in Buenos Aires is a 10,827 ft, lighted, asphalt runway oriented 102°/282°. The runway is 197 ft wide. SkyMeter has observed 1,365 landings and 648 departures on this runway over the last 30 days, with approximately 0.1% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 2.4°, touchdowns averaging 697 ft past the threshold, a typical touchdown ground speed of 127 kt, a 8.1 kt average crosswind component, a 6.0 kt average headwind.

Last 30 Days
2013 Operations
648 Deps / 1365 Arrs

Runway 11/29 at Ministro Pistarini International Airport (SAEZ) in Buenos Aires is a 10,827 ft, lighted, asphalt runway oriented 102°/282°. The runway is 197 ft wide. SkyMeter has observed 1,365 landings and 648 departures on this runway over the last 30 days, with approximately 0.1% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 2.4°, touchdowns averaging 697 ft past the threshold, a typical touchdown ground speed of 127 kt, a 8.1 kt average crosswind component, a 6.0 kt average headwind.

Runway at a Glance

Arrival Volume

1,365 landings observed on Runway 11 in the last 30 days, alongside 648 departures.

Peak Hour

Busiest landing window observed at 09:00 with 5 arrivals on the recent sample.

Average Touchdown Zone

Aircraft touch down on average 697 ft from the threshold on Runway 11.

Prevailing Wind & Gust History

Over the past 365 days, winds at SAEZ have prevailed from the south-southeast (150°), accounting for roughly 13% of windy observations. Average wind speed sits at 6.4 kt with peak gusts to 42 kt. Strong-wind days are infrequent here.

Moderate Crosswind Component

Average crosswind on landing is 8.1 kt at touchdown, measured against runway 11 alignment.

Approach Slope

Final-approach slope averages 2.4° on Runway 11, shallower than the standard 3°.

Landing Behavior and Touchdown Performance

The metrics below are computed from ADS-B trace data observed at Runway 11 over the last 30 days. Each value is shown only when at least 10 valid samples were available; sparse cells are hidden rather than estimated.

Avg approach slope
2.4°
Avg touchdown GS
127 kts
Avg touchdown zone
697 ft
Avg headwind
6.0 kt

Hourly Landing Distribution

07:00 1 landings
08:00 2 landings
09:00 5 landings
10:00 5 landings
11:00 2 landings
12:00 4 landings
13:00 4 landings
16:00 3 landings
17:00 4 landings
18:00 1 landings
19:00 5 landings
20:00 2 landings
21:00 4 landings
22:00 3 landings
23:00 5 landings

Recent observed landings on Runway 11 grouped by hour-of-day (UTC).

Go-Around Analysis

A go-around occurs when a pilot aborts a landing attempt and initiates a climb to return for another approach. While go-arounds are a normal safety procedure, their frequency and causes provide insight into operational challenges at specific runways. Runway 11 experienced go-arounds in 0.1% of arrivals over the last 30 days (1 events of 1366 attempts).

Recent Go-Around Events

34c54241-59c7-9e4a-9db5-31d37a80923d
2026-07-01 12:02
Other
34c54241-59c7-9e4a-9db5-31d37a80923d
2026-07-01 12:02
Other
34c54241-59c7-9e4a-9db5-31d37a80923d
2026-07-01 12:02
Other
34c54241-59c7-9e4a-9db5-31d37a80923d
2026-07-01 12:02
Other

These events represent normal safety procedures and do not indicate operational deficiencies.

Go-Around Causes Distribution

Other 4 events (100%)

Environmental factors dominate go-around causes, indicating that operational procedures remain sound.

Approach Types and Categories

Aircraft approach runways using different procedures based on weather conditions, visibility, and available navigation equipment. An Instrument Landing System (ILS) approach provides precision horizontal and vertical guidance using ground-based radio signals, enabling aircraft to land in low visibility conditions. Visual approaches require pilots to maintain visual contact with the runway and surrounding terrain, typically used during clear weather. Area Navigation (RNAV) approaches use GPS technology to guide aircraft along specific flight paths.

Approach Categories Explained

Category (CAT) classifications define minimum visibility and decision height requirements for instrument approaches. Higher categories enable operations in lower visibility conditions.

CAT I
Decision Height: 200 ft
Visibility: 550m
CAT II
Decision Height: 100 ft
Visibility: 300m
CAT III
Decision Height: 0-50 ft
Visibility: 0-200m
Visual
Clear of Clouds
Visibility: 5 km

Wind and Environmental Factors

Wind conditions directly impact runway operations, influencing approach difficulty, landing performance, and runway selection. Runway 11 benefits from favorable wind alignment, with prevailing winds creating minimal crosswind components for most operations. Average wind speeds of 12 knots pose no operational constraints for commercial aircraft.

24-Hour Wind Pattern

07:00
170° at 9 kts, gusting 0 kts
9 kts
08:00
170° at 9 kts, gusting 0 kts
9 kts
09:00
174° at 10 kts, gusting 0 kts
10 kts
10:00
154° at 12 kts, gusting 26 kts
12 kts
11:00
160° at 12 kts, gusting 22 kts
12 kts
12:00
160° at 10 kts, gusting 24 kts
10 kts
13:00
160° at 10 kts, gusting 28 kts
10 kts
16:00
150° at 11 kts, gusting 24 kts
11 kts
17:00
150° at 12 kts, gusting 24 kts
12 kts
18:00
150° at 10 kts, gusting 0 kts
10 kts
19:00
154° at 10 kts, gusting 0 kts
10 kts
20:00
160° at 9 kts, gusting 0 kts
9 kts
21:00
152° at 8 kts, gusting 0 kts
8 kts
22:00
147° at 9 kts, gusting 20 kts
9 kts
23:00
140° at 10 kts, gusting 20 kts
10 kts
METAR
0° at 0 kts, gusting 0 kts
0 kts

Wind patterns show typical diurnal variation with stronger winds during midday hours.

Average Speed
12 kts
Peak Gust
18 kts
Prevailing Direction
102°
Avg Crosswind
8 kts

Related Pages

About This Data

This analysis covers 2013 operations recorded over the past 30 days, derived from global ADS-B flight broadcasts. Coverage may be incomplete in areas with limited ground-station reception, and statistics may vary with weather and traffic volume.