Flight Status & Tracker

N185DE

HERITAGE CONSTRUCTION CO LLC · KRYW → 3TA0 · Last tracked Oct 23, 2026

N185DE is a flight number operated by HERITAGE CONSTRUCTION CO LLC between Lago Vista Texas Rusty Allen Airport (KRYW) and Four Square Ranch Airport (3TA0). SkyMeter last tracked N185DE on October 23, 2026. The flight is most often flown by a CESSNA Cessna 185 Skywagon. Typical block time is 0h 42m. SkyMeter has observed 16 legs of this flight number via ADS-B.

SkyMeter tracks historical flight activity from ADS-B data — this is not a live gate-to-gate status feed.

✈
FLIGHTS
16
last 90 days
⏱
AVG DURATION
42m
tracked time
📅
SERVICE PERIOD
6/2/2025 → 10/23/2026
first → last seen
🗺
ROUTES / TYPES
14 / 1
city pairs · airframes
⚠
INCIDENT RATE
12.5%
2 flagged

Routes flown

By count · last 90 days

10
2
avg 57m · Lago Vista Texas Rusty Allen → Four Square Ranch
avg 40m · Stowers Ranch → Lago Vista Texas Rusty Allen
1
avg 56m · Edwards County → Lago Vista Texas Rusty Allen
1
avg 1h 16m · Tyler Pounds → Lago Vista Texas Rusty Allen
1
avg 40m · Lago Vista Texas Rusty Allen → South Texas Regional Airport at Hondo
1
avg 6m · Spring Ranch → Edwards County
avg 25m · Hill Country Memorial Hospital Heliport → Lago Vista Texas Rusty Allen
1
avg 1h 25m · Austin Bergstrom → Tyler Pounds
1
avg 35m · Llano → Austin Bergstrom
1
avg 40m · Lago Vista Texas Rusty Allen → Kerrville Municipal Louis Schreiner Field

Aircraft types

Equipment used on this number

1

Safety profile

Flagged flights · last 90 days

Go-arounds
0
Unstable approach
2
Rejected TO
0
Stall warnings
0
Overspeeds
0
Runway excursion
0
Counts represent flights with at least one occurrence of each flag, not the total event count. See /incidents for individual events.

Recent flights

Newest 30 operations of N185DE

30
10/23/2026
39m
△ Low approach-stability score
8/30/2026
24m
△ Low approach-stability score
3/28/2026
35m
△ Low approach-stability score
3/15/2026
35m
△ Low approach-stability score
© SkyMeter · All flight data subject to ODbL attribution · Tracked: 90-day window