Flight Status & Tracker

N602BM

BUTLER MACHINERY COMPANY · FAR → FET · Last tracked Oct 5, 2026

N602BM is a flight number operated by BUTLER MACHINERY COMPANY between Hector International Airport (KFAR) and Fremont Municipal Airport (KFET). SkyMeter last tracked N602BM on October 5, 2026. The flight is most often flown by a PILATUS Pilatus PC-12. Typical block time is 2h 3m. SkyMeter has observed 19 legs of this flight number via ADS-B.

SkyMeter tracks historical flight activity from ADS-B data — this is not a live gate-to-gate status feed.

✈
FLIGHTS
19
last 90 days
⏱
AVG DURATION
2h 3m
tracked time
📅
SERVICE PERIOD
6/16/2025 → 10/5/2026
first → last seen
🗺
ROUTES / TYPES
17 / 1
city pairs · airframes
⚠
INCIDENT RATE
31.6%
6 flagged

Routes flown

By count · last 90 days

10
2
avg 2h 30m · Hector → Joe Foss Field
2
avg 2h 11m · Hector → Fremont
1
avg 58m · Joe Foss Field → Hector
1
avg 1h 28m · Braun → Hector
1
avg 2h 20m · Fremont → Rapid City
1
avg 4h 2m · Austin Straubel → Hector
1
avg 3h 8m · Klawock → Spokane
1
avg 26m · Joe Foss Field → Watertown
1
avg 1h 26m · Fremont → Hector
1
avg 3h 49m · Hector → Austin Straubel

Aircraft types

Equipment used on this number

1

Safety profile

Flagged flights · last 90 days

Go-arounds
0
Unstable approach
6
Rejected TO
0
Stall warnings
0
Overspeeds
0
Runway excursion
0
Counts represent flights with at least one occurrence of each flag, not the total event count. See /incidents for individual events.

Recent flights

Newest 30 operations of N602BM

30
10/5/2026
2h 8m
△ Low approach-stability score
10/2/2026
2h 10m
△ Low approach-stability score
9/11/2026
42m
△ Low approach-stability score
9/10/2026
4h 2m
△ Low approach-stability score
9/3/2026
57m
△ Low approach-stability score
7/24/2026
44m
△ Low approach-stability score
7/24/2026
2h 19m
△ Low approach-stability score
7/10/2026
3h 54m
△ Low approach-stability score
7/9/2026
44m
△ Low approach-stability score
7/9/2026
1h 45m
△ Low approach-stability score
© SkyMeter · All flight data subject to ODbL attribution · Tracked: 90-day window