STT62 is operated by SOUTHPORT AIR LLC between Menasha Pad (1OR2) and Boeing Field King County International Airport (KBFI). The flight is most often flown by a PILATUS Pilatus PC-12. Typical block time is 1h 47m. SkyMeter has observed 58 legs of this flight number via ADS-B.

FLIGHTS
58
last 90 days
AVG DURATION
1h 47m
tracked time
📅
SERVICE PERIOD
05/27/2025 → 07/03/2026
first → last seen
🗺
ROUTES / TYPES
44 / 1
city pairs · airframes
INCIDENT RATE
5.2%
3 flagged

Routes flown

By count · last 90 days

10
3
avg 1h 16m · Menasha Pad → Boeing Field King County
2
avg 2h 8m · Southwest Oregon → Boise Air Terminal/Gowen Field
1
avg 48m · Southwest Oregon → Portland Hillsboro
1
avg 1h 44m · Friday Harbor → Boise Air Terminal/Gowen Field
1
avg 1h 17m · Portland → Boise Air Terminal/Gowen Field
1
avg 47m · Southwest Oregon → Portland
1
avg 1h 19m · Sunnyhill → Snohomish County (Paine Field)
1
avg 1h 52m · Friedman → Southwest Oregon
1
avg 2h 14m · Southwest Oregon → Jerome County
1
avg 21m · Vancouver → Bellingham

Aircraft types

Equipment used on this number

1

Safety profile

Flagged flights · last 90 days

Go-arounds
0
Unstable approach
3
Rejected TO
0
Stall warnings
0
Overspeeds
0
Runway excursion
0
Counts represent flights with at least one occurrence of each flag, not the total event count. See /incidents for individual events.

Recent flights

Newest 30 operations of STT62

30
07/03/2026
1h 51m
No alerts
07/02/2026
1h 44m
No alerts
07/02/2026
3h 15m
No alerts
07/01/2026
1h 55m
No alerts
06/20/2026
10m
△ Unstable approach
06/18/2026
19m
△ Unstable approach
06/16/2026
16m
△ Unstable approach
06/12/2026
3h 17m
No alerts
06/11/2026
17h 20m
No alerts
06/08/2026
1h 33m
No alerts
06/06/2026
2h 17m
No alerts
06/03/2026
2h 24m
No alerts
06/03/2026
1h 27m
No alerts
06/01/2026
1h 20m
No alerts
06/01/2026
1h 12m
No alerts
06/01/2026
1h 28m
No alerts
05/31/2026
1h 3m
No alerts
05/31/2026
1h 18m
No alerts
05/28/2026
2h 13m
No alerts
05/28/2026
2h 13m
No alerts
© SkyMeter · All flight data subject to ODbL attribution · Tracked: 90-day window