Go-around — GNY4524

ETNG · 09

2026-02-05 13:57 UTC· ETMN ETNG· P8

GNY4524 was operating from ETMN to ETNG on 2026-02-05. SkyMeter detected a go-around at Geilenkirchen Air Base (ETNG) on runway 09 at 13:57 UTC. Trace data at the event: 625 ft AGL, 158 kt GS. Approach stability score: 85/100. Scores in this band are observed on roughly 25% of approaches at this runway: one or more gates outside the per-runway tightest envelope, but still inside the typical operating range. METAR at the time reported 8 kt wind. A go-around is a discontinued landing approach in which the pilot adds power and climbs back to a safe altitude before re-attempting the approach or proceeding to an alternate. It is a routine safety response, not an emergency, and is taught as the standard reaction to any unstable approach. Detection algorithm and known limitations: see SkyMeter methodology.

Pilot review data

  • Runway 09
  • 625 ft AGL at event
  • 158 kt ground speed
  • 0 fpm vertical
  • Approach stability 85/100
  • 8 kt wind
  • 0 kt crosswind component
  • METAR ETNG 232250Z 27008KT CAVOK 17/13 Q1022

Flight context

  • GNY4524
  • P8
  • ETMN → ETNG
  • 2026-02-05 13:57 UTC
  • ETNG runway 09

All events on this flight

Go-around 13:57:07 UTC · ETNG runway 09 · 625 ft AGL · 158 kt GS
Go-around 14:07:58 UTC · ETNG runway 09 · 467 ft AGL · 149 kt GS
Go-around 14:31:57 UTC · ETNG runway 09 · 442 ft AGL · 146 kt GS
Go-around 15:20:40 UTC · ETNG runway 09 · 468 ft AGL · 143 kt GS
Go-around 15:53:11 UTC · ETNG runway 09 · 492 ft AGL · 146 kt GS

Automated analysis. Events shown on this page (such as go-around, unstable approach, or runway events) are heuristic classifications produced by algorithms from publicly broadcast ADS-B data. They are intended to surface flights of interest for further review — they are not findings of fact, and they do not determine pilot fault, regulatory compliance, or the cause of any occurrence. Coverage gaps and sensor noise can affect accuracy. Only the relevant civil aviation authority or accident investigation body can make official determinations. How we detect events · Dispute or correct this data

SkyMeter · trace data observed via ADS-B· ETNG