Go-around — KII835

KMEM · 18R

2025-11-25 13:49 UTC· KCVG → KMEM· UMB BANK NA TRUSTEE· B738

KII835 (UMB Bank NA) was operating from KCVG to KMEM on 2025-11-25. SkyMeter detected a go-around at Memphis International Airport (KMEM) on runway 18R at 13:49 UTC. Trace data at the event: 881 ft AGL, 142 kt GS. METAR at the time reported 6 kt wind, 5 kt crosswind component, 16,093 m visibility. A go-around is a discontinued landing approach in which the pilot adds power and climbs back to a safe altitude before re-attempting the approach or proceeding to an alternate. It is a routine safety response, not an emergency, and is taught as the standard reaction to any unstable approach. Detection algorithm and known limitations: see SkyMeter methodology.

Pilot review data

  • Runway 18R
  • 881 ft AGL at event
  • 142 kt ground speed
  • 0 fpm vertical
  • 6 kt wind
  • 5 kt crosswind component
  • 16,093 m visibility
  • METAR KMEM 251854Z 04004KT 10SM FEW045 SCT240 28/15 A3012 RMK AO2 SLP194 T02780150 $

Flight context

  • KII835
  • UMB Bank NA
  • B738
  • KCVG → KMEM
  • 2025-11-25 13:49 UTC
  • KMEM runway 18R

All events on this flight

Go-around 13:49:42 UTC · KMEM runway 18R · 881 ft AGL · 142 kt GS
Go-around 13:49:42 UTC · KMEM runway 18R · 881 ft AGL · 142 kt GS
Go-around 13:49:38 UTC · KMEM runway 18R · 828 ft AGL · 134 kt GS
Go-around 13:49:38 UTC · KMEM runway 18R · 828 ft AGL · 134 kt GS
Go-around 13:49:42 UTC · KMEM runway 18R · 881 ft AGL · 142 kt GS
Go-around 13:49:42 UTC · KMEM runway 18R · 881 ft AGL · 142 kt GS

Automated analysis. Events shown on this page (such as go-around, unstable approach, or runway events) are heuristic classifications produced by algorithms from publicly broadcast ADS-B data. They are intended to surface flights of interest for further review — they are not findings of fact, and they do not determine pilot fault, regulatory compliance, or the cause of any occurrence. Coverage gaps and sensor noise can affect accuracy. Only the relevant civil aviation authority or accident investigation body can make official determinations. How we detect events · Dispute or correct this data

SkyMeter · trace data observed via ADS-B· KMEM