PLUTO05 was operating from EPRA to EPRA on 2026-07-27. SkyMeter detected a go-around at Radom Airport (EPRA) on runway 25 at 15:10 UTC. Trace data at the event: 797 ft AGL, 86 kt GS. METAR at the time reported 13 kt wind, 7 kt crosswind component, 9,994 m visibility. A go-around is a discontinued landing approach in which the pilot adds power and climbs back to a safe altitude before re-attempting the approach or proceeding to an alternate. It is a routine safety response, not an emergency, and is taught as the standard reaction to any unstable approach. Detection algorithm and known limitations: see SkyMeter methodology.
Pilot review data
- Runway 25
- 797 ft AGL at event
- 86 kt ground speed
- 0 fpm vertical
- 13 kt wind
- 7 kt crosswind component
- 9,994 m visibility
- EPRA 041630Z 01009KT CAVOK 32/17 Q1014
Flight context
- PLUTO05
- DH8D
- EPRA → EPRA
- 2026-07-27 15:10 UTC
- EPRA runway 25
Automated analysis. Events shown on this page (such as go-around, unstable approach, or runway events) are heuristic classifications produced by algorithms from publicly broadcast ADS-B data. They are intended to surface flights of interest for further review — they are not findings of fact, and they do not determine pilot fault, regulatory compliance, or the cause of any occurrence. Coverage gaps and sensor noise can affect accuracy. Only the relevant civil aviation authority or accident investigation body can make official determinations. How we detect events · Dispute or correct this data