GOJLD

GOJLD · QUG EGXG

GOJLD is operated by between Goodwood Aerodrome (EGHR) and Leeds East Airport (EGXG). The flight is most often flown by a . Typical block time is 0h 47m. SkyMeter has observed 30 legs of this flight number via ADS-B.

FLIGHTS
30
last 90 days
AVG DURATION
47m
tracked time
📅
SERVICE PERIOD
06/18/2025 → 07/17/2026
first → last seen
🗺
ROUTES / TYPES
9 / 1
city pairs · airframes
INCIDENT RATE
20.0%
6 flagged

Routes flown

By count · last 90 days

5
6
avg 1h 16m · Goodwood Aerodrome → Leeds East
2
avg 8m · Breighton Airfield → Leeds East
1
avg 11m · Goodwood Aerodrome → Solent
1
avg 45m · Sherburn-In-Elmet Airfield → Leeds East
1
avg 1h 13m · Solent → Leeds East

Aircraft types

Equipment used on this number

1

Safety profile

Flagged flights · last 90 days

Go-arounds
0
Unstable approach
6
Rejected TO
0
Stall warnings
0
Overspeeds
0
Runway excursion
0
Counts represent flights with at least one occurrence of each flag, not the total event count. See /incidents for individual events.

Recent flights

Newest 30 operations of GOJLD

30
07/17/2026
39m
No alerts
07/17/2026
56m
No alerts
07/09/2026
1h 13m
△ Low approach-stability score
07/08/2026
10m
△ Low approach-stability score
07/07/2026
1h 11m
No alerts
07/06/2026
1h 22m
△ Low approach-stability score
07/06/2026
1h 11m
No alerts
07/05/2026
1h 15m
No alerts
07/04/2026
19m
No alerts
07/04/2026
1h 11m
No alerts
07/03/2026
28m
No alerts
06/20/2026
10m
No alerts
06/20/2026
14m
No alerts
06/15/2026
43m
No alerts
06/14/2026
1h 14m
△ Low approach-stability score
06/14/2026
26m
No alerts
06/14/2026
1h 4m
No alerts
06/13/2026
44m
No alerts
05/26/2026
23m
No alerts
05/11/2026
5m
No alerts
05/11/2026
7m
No alerts
05/10/2026
1h 19m
No alerts
05/10/2026
18m
No alerts
05/09/2026
1h 13m
No alerts
05/08/2026
1h 11m
△ Low approach-stability score
05/08/2026
1h 19m
No alerts
05/04/2026
1h 13m
△ Low approach-stability score
05/03/2026
1h 14m
No alerts
04/26/2026
17m
No alerts
04/26/2026
17m
No alerts
© SkyMeter · All flight data subject to ODbL attribution · Tracked: 90-day window