Go-around — SWIFT89

KMZJ · 30

2025-11-26 18:15 UTC· KBLV → KMZJ· LJ35

SWIFT89 was operating from KBLV to KMZJ on 2025-11-26. SkyMeter detected a go-around at Pinal Airpark (KMZJ) on runway 30 at 18:15 UTC. Trace data at the event: 2023 ft AGL, 129 kt GS. Approach stability score: 62/100. Scores in this band occur on roughly 10-15% of approaches at this runway, with multiple gates outside the per-runway envelope. METAR at the time reported 4 kt wind, 2 kt crosswind component, 16,093 m visibility. A go-around is a discontinued landing approach in which the pilot adds power and climbs back to a safe altitude before re-attempting the approach or proceeding to an alternate. It is a routine safety response, not an emergency, and is taught as the standard reaction to any unstable approach. Detection algorithm and known limitations: see SkyMeter methodology.

Pilot review data

  • Runway 30
  • 2023 ft AGL at event
  • 129 kt ground speed
  • 0 fpm vertical
  • Approach stability 62/100
  • 4 kt wind
  • 2 kt crosswind component
  • 16,093 m visibility
  • METAR KMZJ 260010Z AUTO 31007G12KT 10SM CLR 31/14 A2992 RMK AO2

Flight context

  • SWIFT89
  • LJ35
  • KBLV → KMZJ
  • 2025-11-26 18:15 UTC
  • KMZJ runway 30

All events on this flight

Go-around 18:15:11 UTC · KMZJ runway 30 · 2,023 ft AGL · 129 kt GS
Go-around 18:15:11 UTC · KMZJ runway 30 · 2,023 ft AGL · 129 kt GS
Go-around 18:15:11 UTC · KMZJ runway 30 · 2,023 ft AGL · 129 kt GS
Go-around 18:15:11 UTC · KMZJ runway 30 · 2,023 ft AGL · 129 kt GS

Automated analysis. Events shown on this page (such as go-around, unstable approach, or runway events) are heuristic classifications produced by algorithms from publicly broadcast ADS-B data. They are intended to surface flights of interest for further review — they are not findings of fact, and they do not determine pilot fault, regulatory compliance, or the cause of any occurrence. Coverage gaps and sensor noise can affect accuracy. Only the relevant civil aviation authority or accident investigation body can make official determinations. How we detect events · Dispute or correct this data

SkyMeter · trace data observed via ADS-B· KMZJ