Long landing rollout — SHT6U

EGPF · 09

2026-01-29 22:15 UTC· EGLL → EGPF· A21N

SHT6U was operating from EGLL to EGPF on 2026-01-29. SkyMeter detected a long landing rollout at Glasgow International Airport (EGPF) on runway 09 at 22:15 UTC. Trace data at the event: 0 ft AGL, 3 kt GS, 0 fpm vertical. Approach stability score: 83/100. Scores in this band are observed on roughly 25% of approaches at this runway: one or more gates outside the per-runway tightest envelope, but still inside the typical operating range. METAR at the time reported 9 kt wind, 9,999 m visibility. A long landing rollout is detected when ground deceleration after touchdown is below the per-runway P10 envelope. It is an observational measure of rollout efficiency, not a runway-exit incident. Detection algorithm and known limitations: see SkyMeter methodology.

Pilot review data

  • Runway 09
  • 0 ft AGL at event
  • 3 kt ground speed
  • 0 fpm vertical
  • Approach stability 83/100
  • 9 kt wind
  • 0 kt crosswind component
  • 9,999 m visibility
  • METAR EGPF 252020Z AUTO 23005KT 9999 BKN035/// //////CB 11/08 Q1016

Flight context

  • SHT6U
  • A21N
  • EGLL → EGPF
  • 2026-01-29 22:15 UTC
  • EGPF runway 09

All events on this flight

Long landing rollout 22:15:46 UTC · EGPF runway 09 · 0 ft AGL · 3 kt GS
Long landing rollout 22:15:46 UTC · EGPF runway 09 · 0 ft AGL · 3 kt GS
Long landing rollout 22:15:46 UTC · EGPF runway 09 · 0 ft AGL · 3 kt GS
Long landing rollout 22:15:46 UTC · EGPF runway 09 · 0 ft AGL · 3 kt GS

Automated analysis. Events shown on this page (such as go-around, unstable approach, or runway events) are heuristic classifications produced by algorithms from publicly broadcast ADS-B data. They are intended to surface flights of interest for further review — they are not findings of fact, and they do not determine pilot fault, regulatory compliance, or the cause of any occurrence. Coverage gaps and sensor noise can affect accuracy. Only the relevant civil aviation authority or accident investigation body can make official determinations. How we detect events · Dispute or correct this data

SkyMeter · trace data observed via ADS-B· EGPF