Long landing rollout — TRA94Y

GCRR · 03

2026-07-25 16:06 UTC· EHAM GCRR· A21N

TRA94Y was operating from EHAM to GCRR on 2026-07-25. SkyMeter detected a long landing rollout at Lanzarote Airport (GCRR) on runway 03 at 16:06 UTC. Trace data at the event: 16 ft AGL, 7 kt GS, 0 fpm vertical. METAR at the time reported 28 kt wind, 8 kt crosswind component, 9,994 m visibility. A long landing rollout is detected when ground deceleration after touchdown is below the per-runway P10 envelope. It is an observational measure of rollout efficiency, not a runway-exit incident. Detection algorithm and known limitations: see SkyMeter methodology.

Pilot review data

  • Runway 03
  • 16 ft AGL at event
  • 7 kt ground speed
  • 0 fpm vertical
  • 28 kt wind
  • 8 kt crosswind component
  • 9,994 m visibility
  • GCRR 162130Z 01015G25KT 330V050 9999 FEW018 24/19 Q1018

Flight context

  • TRA94Y
  • A21N
  • EHAM → GCRR
  • 2026-07-25 16:06 UTC
  • GCRR runway 03

Automated analysis. Events shown on this page (such as go-around, unstable approach, or runway events) are heuristic classifications produced by algorithms from publicly broadcast ADS-B data. They are intended to surface flights of interest for further review — they are not findings of fact, and they do not determine pilot fault, regulatory compliance, or the cause of any occurrence. Coverage gaps and sensor noise can affect accuracy. Only the relevant civil aviation authority or accident investigation body can make official determinations. How we detect events · Dispute or correct this data

SkyMeter · trace data observed via ADS-B· GCRR